Charging management system · OCPP 1.6 and 2.0.1 · OCPI
One platform for charging depots, fleets and public stations.
EcoStation brings chargers from different manufacturers, drivers, vehicles and billing into one system. You manage grid connection power, tariffs and availability from a single panel, while drivers charge with the app, an RFID card or a terminal at the station.
Power grid
connection limit
1200 kW
EcoStation
Depot
680 kW
Fleet
180 kW
Public station
140 kW
One system, four areas
- DepotsDynamic management of grid connection power and bus charging aligned with the departure schedule.
- FleetsRFID cards, a consolidated invoice and full control of company vehicle charging costs.
- Public chargingTariffs, payments without registration, OCPI roaming and automatic billing for public stations.
- Service panelCharging network status on a map, anomaly detection, user reports and a station availability chart.
Partners
We work with e-mobility leaders
Hardware manufacturers, industry organisations and implementation partners we build charging infrastructure with.
Standards and integrations
Built on open standards
OCPP and OCPI connect EcoStation to chargers from any manufacturer and to other operators’ networks. Drivers pay the way they’re used to, and the mobile app works from day one.
OCPP 1.6 and 2.0.1
AC and DC chargers from any manufacturer
OCPI
Roaming and tariff exchange with other operators
BLIK · card · Apple Pay · Google Pay
Payment at the station without registration
iOS and Android
Driver app in 4 languages
Why EcoStation
Our own system, no compromises
Manufacturer independence
We connect AC and DC chargers of different brands over OCPP. Replacing hardware does not mean replacing the system.
Full automation
Authorisation, session start, settlement, invoice and report happen without staff involvement.
A team in Poland
We design and develop the system with our own team in Kraków. Implementation, integrations and support are handled by us.
CPO and eMSP in one
The infrastructure operator and the driver service provider work on the same system and the same data.
How it works
From plug to invoice
The EcoStation system sits between the driver and the charger. It authorises, meters, bills and reports, and when grid power is limited it decides how much energy reaches each point.
Drivers and vehicles
Mobile app, RFID card, payment terminal at the station or a QR code. Session start in seconds.
- iOS and Android app
- RFID cards and user groups
- QR payment without registration
- Payment terminal at the station
EcoStation system
Authorisation, tariffs, load management, monitoring, billing and reports. A panel for the operator and the service provider.
- Dynamic load management
- Tariffs and group price lists
- Invoices and settlements
- Reports and availability
Chargers
AC and DC stations from any manufacturer compliant with OCPP 1.6 or 2.0.1. Roaming with other networks over OCPI.
- OCPP 1.6 and 2.0.1
- AC Type 2, DC CCS and CHAdeMO
- Remote diagnostics and reset
- OCPI roaming
Mobile app
Drivers see availability, price and cost as it happens
The EcoStation app for iOS and Android takes the driver from finding a station to the invoice. Available in Polish, English, Czech and Romanian.
Map with live availability
Number of free points, power and price at every station before the driver arrives.
Start by QR code or from the list
Scan the code at the station or pick a point in the app. Power, energy and cost shown while charging.
Payments and invoices
Card, BLIK, Apple Pay and Google Pay. An invoice is generated automatically after every session.
History, vehicles and vouchers
Charging history with costs, saved vehicles, billing details and discount codes.
kW
kW
kW
Kraków – Dobrego Pasterza
Dobrego Pasterza 120C
Maximum power: 150 kW
Available points: 3
Occupied: 1 · Turned off: 0
- PL31 · 150 kW1,89 PLN / kWhAvailable
- PL32 · 22 kW1,45 PLN / kWhAvailable
- PL33 · 150 kW1,89 PLN / kWhCharging
Active session
- Power
- 48 kW
- Energy
- ~17,8 kWh
- Total
- ~33,64 PLN
Let's talk about your infrastructure
We will show the system live on your own example: a depot, a fleet or public stations. The demo takes about 30 minutes.